Download your CPD Certificate / Summary

Thank you...

...for attending our Stamisol CPD Webinar: "How to achieve external wall systems completely in Euroclass A2" at DCE Fire & Prevention Day at 17th of April 2024.

We hope, you've gained valuable information for your projects and façade design.

Please download your certificate as pdf. Just fill in your name and it's prepared for you.

DOWNLOAD PDF Certificate

Downloads

The download for the announced checklist for UK standards of membranes is here:
DOWNLOAD Checklist Standards UK for Facade Membranes

If you would like to have a summary of the CPD Webinar please download pdf

DOWNLOAD Summary CPD Webinar

If you interested in further documentation or construction models please visit our page

Documentation Stamisol Safe One

Contact

For more informations about Euroclass A2 facade breather membranes Stamisol Safe One, please get in touch with our UK distribution partner ITP:

Industrial Textiles & Plastics Ltd
EMail
mv@itpltd.com
Tel:
+44 (0)1347 825220

Further topics

Learn more about maximum fire safety and creativity for your full façade system with Stamisol Safe One façade breather membrane Class A2-s1,d0

Applications Façades A2

Stamisol Safe One can be used both for closed and partially open vertical façades with up to 50 mm joints or an open area up to 50 % especially for apartment blocks higher than 11 meters, hospitals, retirement homes, rehab centres, universities, schools, nurseries and building floor extensions.

Read more...

Applications Façades A2Stamisol Safe One can be used both for closed and partially open vertical façades with up to 50 mm joints or an open area up to 50 % especially for apartment blocks higher than 11 meters, hospitals, retirement homes, rehab centres, universities, schools, nurseries and building floor extensions.Read more...
Applications Façades A2Stamisol Safe One can be used both for closed and partially open vertical façades with up to 50 mm joints or an open area up to 50 % especially for apartment blocks higher than 11 meters, hospitals, retirement homes, rehab centres, universities, schools, nurseries and building floor extensions.Read more...

The first façade membrane A2-s1,d0

Stamisol Safe One expands the design freedom for architects in creating facades with maximum fire safety:
— Life-saving membrane by being Euroclass A2-s1,d0
— Resistance to water penetration W1
— Excellent UV resistance, ideal for both open and closed façades

Read more...

The first façade membrane A2-s1,d0Stamisol Safe One expands the design freedom for architects in creating facades with maximum fire safety: — Life-saving membrane by being Euroclass A2-s1,d0— Resistance to water penetration W1— Excellent UV resistance, ideal for both open and closed façadesRead more...
The first façade membrane A2-s1,d0Stamisol Safe One expands the design freedom for architects in creating facades with maximum fire safety: — Life-saving membrane by being Euroclass A2-s1,d0— Resistance to water penetration W1— Excellent UV resistance, ideal for both open and closed façadesRead more...
New

UK fire regulations for façades

Why all materials, which are part of an external wall should achieve a class A2-s1,d0 including facade membranes. Let's check, what experts say and why fire safety is everyone’s responsibility when designing or installing façades.

Read more...

UK fire regulations for façadesWhy all materials, which are part of an external wall should achieve a class A2-s1,d0 including facade membranes. Let's check, what experts say and why fire safety is everyone’s responsibility when designing or installing façades.Read more...
UK fire regulations for façadesWhy all materials, which are part of an external wall should achieve a class A2-s1,d0 including facade membranes. Let's check, what experts say and why fire safety is everyone’s responsibility when designing or installing façades.Read more...

Support & Service

Stamisol Technical Team will support your façade projects with consulting for sustainable fire protection, construction models, specific site advice and installation guides.

Read more...

Support & ServiceStamisol Technical Team will support your façade projects with consulting for sustainable fire protection, construction models, specific site advice and installation guides.Read more...
Support & ServiceStamisol Technical Team will support your façade projects with consulting for sustainable fire protection, construction models, specific site advice and installation guides.Read more...

Why use a breathable façade membrane

The protective shield for closed and open rear-ventilated façades:
— Ensures dry and functional thermal insulation and protects from deterioration
— No cooling down of the insulation by wind/air
— Building moisture is led to the outside

Read more...

Why use a breathable façade membraneThe protective shield for closed and open rear-ventilated façades: — Ensures dry and functional thermal insulation and protects from deterioration— No cooling down of the insulation by wind/air— Building moisture is led to the outsideRead more...
Why use a breathable façade membraneThe protective shield for closed and open rear-ventilated façades: — Ensures dry and functional thermal insulation and protects from deterioration— No cooling down of the insulation by wind/air— Building moisture is led to the outsideRead more...

A new need for fire safety

In buildings higher than 11 m or high-risk buildings, where mobility may be an issue, fire-fighting control and evacuation is only possible to a limited extent. In order to develop future-oriented concepts in fire safety, the façade membrane is an essential element when incorporated into a wider fire engineering strategy.

Read more...

A new need for fire safetyIn buildings higher than 11 m or high-risk buildings, where mobility may be an issue, fire-fighting control and evacuation is only possible to a limited extent. In order to develop future-oriented concepts in fire safety, the façade membrane is an essential element when incorporated into a wider fire engineering strategy.Read more...
A new need for fire safetyIn buildings higher than 11 m or high-risk buildings, where mobility may be an issue, fire-fighting control and evacuation is only possible to a limited extent. In order to develop future-oriented concepts in fire safety, the façade membrane is an essential element when incorporated into a wider fire engineering strategy.Read more...